Residential Project

Redmond Field at Verrado

OWNER
DMB White Tank, LLC.
PRIME CONTRACTOR
Rummel Construction, Inc.
LOCATION:
Buckeye
YEAR COMPLETED
November, 2015

Redmond Field located at Verrado in Buckeye, AZ was grading project for client DMB Whitetank, LLC. The project included grading and 2,065 CY of 1.5’ excavation below the ballfield design, 4,412 CY excavation of perimeter slopes, stockpile borrow 12” on ballfields, 3,305 CY screening of top 6” to ½” minus ballfields, 3,783 CY over excavation below stockpile to native, 9,622 CY export and rough grading of 31,138 SY.  The project also included SWPPP and traffic control.