Landfill Project

SR85 Landfill Stormwater Control System Phase 2

OWNER
City of Phoenix
LOCATION:
Buckeye
YEAR COMPLETED
August, 2013

Project scope consisted of construction of Stormwater Control System Channel. Construction quantities consisted of 316,000 cubic yards of channel excavation, 46,000 cubic yards of Rip Rap Toe Down and channel slopes excavation, and 35,000 tons of slope and toe rip rap (D50=12”) with 80,000 SY of filter fabric.