Flood Control Project

Verrado Tuthill Wash Phase 3 South

OWNER
DMB White Tank LLC
LOCATION:
Verrado - Buckeye
YEAR COMPLETED
October, 2013

The Tuthill Wash Phase 2 South project consisted of improving an existing drainage channel at Verrado residential community. Improvements consisted of 247,000 cubic yards of excavation, 30,000 tons of buried slope and toe rip rap (D50 = 12”), 6,000 tons of buried grade control structure rip rap (D50 = 18”), 4,000 tons of exposed drop structure rip rap (D50 = 18”), and 4,500 linear feet of low flow channel grading.