Flood Control Project

Wickenburg Ranch Bank Protection

OWNER
JVT Investors / M3 Companies
PRIME CONTRACTOR
Rummel Construction, Inc.
LOCATION:
Wickenburg
YEAR COMPLETED
October, 2014

This project is to provide flood protection to utilities and golf course infrastructure. Running approximately 5000 LF this project will be used as a walking trail for residence but also serves a very important flood protection structure designed for a 100 year flood event or larger. The overall scope includes 9 acres of clearing and grubbing, 53, 342 CY Excavation, 6,687 CY Gabion Mattress placed on 1.5:1 slopes, 9,746 SY ABC for roadway surfacing, (1) Double 5’x10’ concrete box culvert with inlet and outlet erosion protection, and triple 42” culvert piping with concrete headwall and outlet protection.